• Slim Design

Oak Ward Refurbishment


Internal alterations and refurbishment of the ground floor Oak Ward which includes the POS Unit (Place of Safety), and the Crisis Team Unit which is located on the first floor of the Haytor Unit.

Project Value £233,000

The services that were provided were:

Quantity Surveying

Building Surveying

#QuantitySurveying #BuildingSurveying

53 views